How can we help?
Will I Need To Remove Water Tanks?
Water units in the loft will need to be capped off to allow the steel to be installed. Pipes will need to be capped to allow enough space for the floor joists (215mm/165mm) to run beneath.
Water units in the loft will need to be capped off to allow the steel to be installed. Pipes will need to be capped to allow enough space for the floor joists (215mm/165mm) to run beneath.